Maryland Brush Company, a division of Felton Brushes. Since 1851.
Felton MBC Engineering Survey

Coating defects, brush wear, and unplanned downtime usually share one root cause.

Cleaning section problems on a galvanizing line almost always trace back to two or three failures in the same system. A Felton MBC Engineering Survey finds the cause and gives you a prioritized plan with the return on investment for each fix.

Steel coils stacked in a dark mill warehouse
1-4
Days On Site
2 Weeks
Report Turnaround
ROI
Analysis Included

Felton MBC performs on-site Engineering Surveys for continuous galvanizing lines (CGL), cold mill finishing lines, hot dip galvanizing lines, aluminizing lines, and electrolytic cleaning lines with brush scrubber cleaning sections. Each survey includes a full line walkdown, consumable analysis, solution testing, and a written report with prioritized recommendations and return-on-investment calculations.

The symptoms come back because the root cause never gets fixed.

Cleaning section problems on a galvanizing line almost always trace back to the same small set of root causes. Mills that find them usually cut consumable costs, restore coating quality, and stabilize throughput in a single cycle.

Coating defects appear with no clear source.

Fish eyes, uncoated spots and an uneven finish show up on finished coil, and warranty claims climb with no obvious cause. The defect appears at the end of the line. The source is upstream in the cleaning section.

Brushes wear out early.

Brush life that should run nine months or more is down to three or four. The brush usually gets the blame. The cause is almost always filtration that lets soil recirculate, solution temperature drift, or spray headers working against each other.

Unplanned outages add up.

Equipment keeps tripping, failing, or forcing a line stop. Each event looks unrelated on its own. Together they usually point to the same mechanical and chemical issues in the cleaning section.

Operating knowledge leaves with retirements.

A veteran retires and the line keeps running. Nobody on the current team knows why the settings are where they are or what to change when something drifts, because it was never written down.

Steel coil coating line with uncoiler and roll equipment

The survey is a complete diagnostic of the cleaning section.

Most mills call Felton MBC about one problem: coating defects, brushes wearing out too quickly, or outages that keep adding up. The symptoms look unrelated. They usually come from the same system.

Cleaning section problems almost always trace back to a small set of causes: filtration running below spec and letting soil recirculate, solution temperature out of range, spray headers misaligned or working against each other, backup rolls in the wrong position, or operating procedures that changed when a veteran retired and nothing was written down.

Mills that treat the symptom spend more every year and never fix the underlying issue. Mills that find the root cause usually cut consumable costs, restore coating quality, and stabilize throughput in a single cycle.

The Engineering Survey is that diagnostic. You get a report written for your line and your operating conditions. It tells you what to fix first and what each fix is worth.

The survey documents every section of the line.

Felton MBC senior steel mills engineer Jimmy Mitchell and the engineering team spend one to four days on your line, depending on complexity. The survey covers mechanical, chemical, and operational factors, because all three affect the same output.

01

On-Site Line Walkdown

The team observes every section from the pre-cleaner through the dryer, records current operating conditions, and interviews operators across shifts to learn how the line runs day to day.

02

Consumable & Solution Analysis

Caustic solution is sampled, soil load and iron fines are measured against target ranges, and filter media is inspected. Current brush filament condition is analyzed against the expected wear pattern for your line speed and strip metallurgy.

03

Mechanical Review

The review covers spray header positioning and flush cycles, brush footprint behavior at every position, backup roll alignment and pass line break, and filtration capacity and cleanout frequency. Everything that touches the strip gets measured.

04

Written Survey Report

Every finding is ranked by impact and tied to the specific problem it solves, supported by photos, measurements, and diagrams. The report separates short-term operational changes you can make immediately from long-term capital improvements for future planning.

How the engagement runs.

The full engagement typically runs three to five weeks from discovery call to delivered report. Implementation and audit follow on your timeline.

1

Discovery

We meet by video to review symptoms, line diagrams, and piping schematics before the team arrives on site.

2

On-Site Survey

The team spends one to four days on your line collecting samples, taking measurements, and interviewing operators across shifts.

3

Analysis & Report

We write the findings up as a report for your line, usually within two weeks.

4

Review & Plan

We walk through the report with your team. Recommendations are ranked by impact and sequenced by cost and constraints.

5

Implementation

We coordinate the engineering changes on site and deliver operator training where it is needed.

6

Ongoing Audit

Felton MBC returns to verify results against projected outcomes. Many mills schedule routine audits to maintain performance.

The deliverable is a written report that you own.

The report is confidential to your mill and written for your line. It is yours to act on whether or not you buy anything from Felton MBC.

  • A written Engineering Survey report specific to your line
  • Every finding documented with photos, measurements, and diagrams
  • Short-term recommendations with no capital expense
  • Long-term recommendations for capital planning
  • A return-on-investment calculation for the full roadmap
  • Direct access to the Felton MBC engineering team during implementation
  • Optional ongoing line audits to verify and maintain results
Red-hot steel strip moving through a hot rolling mill
1-4 Days
On-Site Survey
2 Weeks
Report Turnaround
5 Line Types
CGL, HDGL, Cold Mill, Aluminizing, Electrolytic
100%
Confidential to Your Mill

Engineering Survey questions and answers.

What is a Felton MBC Engineering Survey?
A Felton MBC Engineering Survey is an on-site diagnostic of a galvanizing line's cleaning section. The survey includes a full line walkdown, consumable and solution analysis, mechanical review, and a written report with prioritized recommendations and a return-on-investment calculation. Surveys typically run one to four days on site with a two-week report turnaround.
Why do brushes wear out faster than expected on a galvanizing line?
Premature brush wear on a continuous galvanizing line is almost always caused by the system around the brush. Common causes include filtration issues that allow soil load to recirculate, solution temperature drift, spray header misalignment, and improper brush footprint settings. A Felton MBC Engineering Survey identifies which factors are driving the wear on your specific line.
What causes coating defects on a continuous galvanizing line?
Coating defects like fish eyes, uncoated spots, and inconsistent surface finish are usually caused by soil load carrying through the cleaning section to the zinc pot. Root causes vary by line and can include filtration, solution chemistry, mechanical setup, and operator procedures. A Felton MBC Engineering Survey traces the defect back to its source in the cleaning section.
How do I know if my cleaning section is the root cause of my coating problems?
If you are seeing coating defects, climbing caustic costs, short brush life, or unplanned downtime at the same time, the cleaning section is likely the root cause. A Felton MBC Engineering Survey provides the diagnostic to confirm it and identify exactly what is driving the symptoms.
How long does an Engineering Survey take?
A Felton MBC Engineering Survey takes one to four days on site, depending on line complexity. Report turnaround is typically two weeks. The full engagement from first conversation to delivered report usually runs three to five weeks.
Who performs the Engineering Survey?
Felton MBC senior steel mills engineer Jimmy Mitchell and the Felton MBC engineering team perform the survey on site, working alongside your mechanical, process, and maintenance specialists.
What lines does Felton MBC survey?
Felton MBC surveys continuous galvanizing lines (CGL), cold mill finishing lines, hot dip galvanizing lines (HDGL), aluminizing lines, electrolytic cleaning lines, and any coated strip cleaning system with brush scrubber cleaning sections. Direct fire furnace lines without brush cleaning are outside the scope.
Do we have to buy brushes from Felton MBC to get a survey?
No. Engineering Surveys are a standalone service. Many mills engage Felton MBC for a survey before making any brush or equipment decisions, and the resulting report is the customer's to act on regardless of what products they ultimately purchase.
What is included in the Engineering Survey report?
The report includes every finding from the on-site diagnostic, ranked by impact, along with short-term operational changes that require no capital expense, long-term capital recommendations, and a return-on-investment calculation for the full roadmap. Every finding is documented with photos, measurements, and diagrams specific to the surveyed line.
What is the return on investment for an Engineering Survey?
ROI varies by line and by which recommendations are implemented. Typical savings come from reduced caustic consumption, reduced water usage, lower filtration costs, extended brush life, and avoided downstream impacts like furnace maintenance and pot dross. Engineering Survey reports include a line-specific ROI calculation based on the mill's current consumable costs.
What happens after the Engineering Survey is delivered?
Felton MBC walks the survey report through with your team, prioritizing recommendations by impact and sequencing them by cost. Many mills implement short-term operational changes immediately and use the long-term recommendations for capital planning. Felton MBC stays available to coordinate engineering changes, deliver operator training, and conduct follow-up audits.
Can Felton MBC help with operator training?
Yes. Felton MBC delivers Surface Finish Training Programs built around your specific line and operators. Training covers the operational knowledge needed to maintain performance across shifts and extend consumable life.
Will the Engineering Survey report be shared with other customers?
No. Engineering Survey reports are confidential to the mill that commissioned them. Felton MBC does not share line-specific findings, measurements, or photos with any other customer.
How do we request an Engineering Survey?
Use the Request an Engineering Survey button on this page or call 1-800-654-0774. The first step is a video meeting where the Felton MBC team reviews the symptoms you are seeing and the line's configuration before scheduling the on-site survey.

Find out what is happening in your cleaning section.

Coating defects, brush wear, and unplanned downtime rarely have three separate causes. They usually share one. An Engineering Survey identifies it and tells you what fixing it is worth.

Or call us directly: 1-800-654-0774